A multi-million pound building designed to accommodate hundreds of staff from two Suffolk councils has recently opened its doors. To help achieve the design criteria of being a “modern, light and airy building” a structural frameless glass balustrade has been installed extensively throughout the reception, staircase and circulation areas complete with glass to tube stainless steel handrail brackets.

Riverside Frameless Glass Balustrade

The White Metal Wet glazed frameless glass balustrade was recommended as this offered a cost effective high loading solution that is fast to install and allows the glass to be perfectly aligned.

Glass to tube handrail brackets were used to stand the handrail off the glass and ensure the handrail complies with the required DDA and Building Regulations.

White Metal supplies balustrade and railing systems to professional installers predominantly in the metalwork, glazing and joinery trades, throughout the United Kingdom. These balustrade systems were supplied to an experienced steel fabrication contractor who works alongside some of the leading construction companies in the UK and Ireland.

Riverside houses around 450 Lowestoft-based staff from Suffolk County Council and Waveney District Council in a building that was been delivered on time and on budget by the councils’ project team and building contractors Kier Construction.

The 3,700m² building was designed by LSI Architects to not only offer excellent comfort for staff and visitors alike but also to deliver substantial savings for the clients in the cost-conscious environment we live in.

Innovation and sustainability have been key considerations throughout the design of this programme according to Kier director Dennis Cotton. He said: “This will be a modern, light and airy building, which offers flexibility and the latest technologies and facilities required for today’s public office buildings.

The building work took just over a year to complete and involved the construction of a three-storey building, complete with conference room facilities and public cafe on the ground floor and workstation areas on the upper floors.

454 Handrail Bracket

“The wet glaze frameless glass system is so fast to install, thanks, it saved us days on site!”

did-you-know

We can supply pre-assembled balustrade systems manufactured to your details ready for simple installation.

Another shining example of the fact that: Our products are not just part numbers!
They are quality solutions designed by caring technicians with on-site experience and technical knowledge.